| Case Study A
Berkley Homes
|
Case Study B
Festival Hall, London
|
Case Study C
Still & West Public House, Portsmouth
|
|
|
|
The Development of twelve new-build luxury town houses with basement waterproofing systems and the renovation and conversion of an existing three storey Grade II Listed School into apartments. |
|
Dead space under the railway arches at Festival Hall has been designated for prime retail development.
Waterproofing systems are being applied to three arches to enable them to be used as retail outlets.
|
|
An exposed situation and high tides were causing water penetration through an external wall of this popular seaside pub. Application of an external waterproof rendering system has been undertaken to prevent any further water ingress.
|
|